Project Deployment: 2023
Location: Coffee Production Plant in Binh Duong
Project Scope Introduction:
Current Issues:
– The coffee extraction system was not fully automated, making monitoring and control challenging.
– Manual operations led to product loss, low accuracy, and lack of data collection for monitoring.
– The plant management proposed upgrading the entire extraction system to 100% automation.
Implemented Solution:
– Chosen Products:After thorough consideration, we selected products from Festo, IFM, and other reputable brands known for their safety in the food industry, high accuracy, performance, and longevity.
– Data Monitoring: Data from measurement devices and status reports are continuously displayed on the SCADA system, allowing operators to easily monitor production status.
Results:
– Customer Satisfaction: After installation, the customer was very satisfied with the project.
– Minimal Interruptions: Despite a few minor errors, our dedicated support and experience ensured uninterrupted production.
Equipment – Origin – Brands:
– Festo: Valve terminal, actuator, air tube, fittings.
– IFM: Sensors.
– Allen Bradley: PLC – SCADA system.
Benefits of the Project:
– Fully automated extraction process, reducing monitoring and control difficulties.
– Decreased product loss and increased operational accuracy.
– Monitoring data collection aids in evaluating production activities.
– Improved system performance and lifespan, reducing production interruptions.
– Ensures safety in the food industry and enhances production efficiency.
– Protects worker health due to the relatively high temperature in the extraction area.
– Reduces the number of required personnel.