Project Duration: 2022
Implementation Location: Food processing plant in Binh Duong.
Project Scope Introduction:
Objective:
– Comprehensive installation of a solar energy collection system on the factory roof.
Main Tasks:
– Supply solar panels.
– Reinforce hardware, connect panels, and lay wiring.
– Collect energy from over 700 solar panels.
– Connect the system to the Cloud.
Operational Procedures:
– Program an online energy monitoring system accessible via phone and computer when using the same network.
– Easily monitor electrical energy usage throughout the operation.
Project Benefits:
– Cost savings compared to using grid electricity alone.
– Utilize green energy, contributing to environmental protection.
– Reduce dependency on the electrical grid.
– Facilitate easy energy monitoring and management, optimizing energy usage.